Bathroom renovation: where to start

The bathroom is an area with unique states: high humidity, humidity differences. That’s why making repairs in the restroom, you should definitely plan the whole operating process, to think about the sequence of measures to be performed. In this guide, you will learn where to begin the repair in the restroom and what types of work ought to be carried out with your hands. Step-by-step directions for toilet repair

Stage 1: drawing up a strategy and deciding upon a layout solution.

Fix in the bathroom can be of 2 types:

  • vsyakuhnya.ru Unplanned, spontaneous, originating from the can of unforeseen circumstances. For instance, in the event of an pipe burst, flooding with neighbors.
  • Planned, that is either capital or cosmetic. It requires planning, serious fiscal investment and time.

Begin repairs in the toilet is to determine the plan, inside. Think through the last detail, what’s going to be the space, choose a colour. Pastel colours are conventional, as well as a combination of blue and blue, or cherry with beige.

Begin repairs at the toilet is to find out the design, interior design. Consider detail, what will be the room, select a color. Pastel colors are deemed traditional, in addition to a combination of colours.

Next point is the option of facing material. As a rule, finishing in the bathroom is done with vinyl, porcelain tiles, mosaic, vinyl panels. Check the pipes, if it has to be mended. If necessary, choose the right choice. Proceed to the measuring work: measure all sides, figure out the area of the room. Based on these information, we mark the location of the plumbing fixtures.

Measure 2: the choice of sanitary fittings and substance for completing.

It’s very important to realize that the purchase price of sanitary ware precedes the preparation stage, rather than vice versa. This means that first we develop a design project, create a plan, and then go to the shop. Yet another point – you need to specify how big your favorite plumbing fixtures and check the plan, whether it fits.

It’s crucial to see that the purchase of plumbing fittings is completed by a preparation phase, and not vice versa. This means that first we create a new design project, create a plan, then go to the shop. Another one

In terms of stuff for finishing, it is better to buy them immediately for the whole repair cycle, in order that you will not be distracted if something was missing. Do not forget about preparing the necessary tools.

Step 3: dismantling tiling and plumbing.

Once All of the preliminary work has been completed, move on to the beginning of the task process:

  • Eliminate the sink and tub from the room, even though they won’t be replaced with fresh ones. In this way, you may keep them clean and undamaged.
  • Eliminate the old tile, cleaning following it all of surfaces: walls, ceiling, flooring.
  • Remove paint from the walls, if they had been formerly painted, as the glue alternative or a fresh layer of paint will not stick to surface.

Measure 4: replacement of communications: pipes, electrical wiring.

Quite frequently in an older home, you should carefully inspect and replace not just the pipes that are in the toilet itself, but also the main riser, and sometimes the interfloor pipes. What’s it worth doing so? Old pipes at any time may give a flow, and then the new repair will be spoiled, it will require additional investment to eliminate defects.